Default Theme
AIIMS NEW
अखिल भारतीय आयुर्विज्ञान संस्थान, नई दिल्ली
All India Institute Of Medical Sciences, New Delhi
कॉल सेंटर:  011-26589142

1992-93

The Year 1992-93

 

Staff

Deputy Director R. S. Tyagi
Systems Analyst S. Kailash
Application Programmers S. N. Ragukumar
Satish Prasad
N. G. Sekaran
G. V. Raju
Susil Meher

Education

Postgraduate

Two courses for postgraduate students were conducted during the year. The staff of the centre guided two computer science students from Agra University.

Personnel trained by the department

Training is a regular and on-going activity of Computer Facility. Various training programmes have been conduced to train the staff of use of computers for the patient care system. The personnel trained were Faculty members, Nursing, Hospital and administrative staff.

Patient Care

The Patient Care System on Mainframe computer was implemented in advanced version of the ORACLE RDMBS (Version 6.0). Implementation of ported PCS modules to higher version with faster response at Central Admission, Casualty, Blood Bank and Wards. These facilities were provided round-the-clock to the hospital. Constancy, software development, system design are provided to hospital, departments, administration and the Centres.

The Patient Care System on Mainframe computer was implemented in advanced version of the ORACLE RDMBS (Version 6.0). Implementation of ported PCS modules to higher version with faster response at Central Admission, Casualty, Blood Bank and Wards. These facilities were provided round-the-clock to the hospital. Constancy, software development, system design are provided to hospital, departments, administration and the Centres.

The Patient Care System on Mainframe computer was implemented in advanced version of the ORACLE RDMBS (Version 6.0). Implementation of ported PCS modules to higher version with faster response at Central Admission, Casualty, Blood Bank and Wards. These facilities were provided round-the-clock to the hospital. Constancy, software development, system design are provided to hospital, departments, administration and the Centres.

Significant Events

The Hardware phasing requirements for computerisation of the main hospital and centres has been completed during the year. The Hardware phasing requirements for computerisation of the main hospital and centres has been completed during the year. The Hardware phasing requirements for computerisation of the main hospital and centres has been completed during the year.


©AIIMS , New Delhi, 1998.

Zo2 Framework Settings

Select one of sample color schemes

Google Font

Menu Font
Body Font
Heading Font

Body

Background Color
Text Color
Link Color
Background Image

Header Wrapper

Background Color
Modules Title
Text Color
Link Color
Background Image

Menu Wrapper

Background Color
Modules Title
Text Color
Link Color
Background Image

Main Wrapper

Background Color
Modules Title
Text Color
Link Color
Background Image

Inset Wrapper

Background Color
Modules Title
Text Color
Link Color
Background Image

Bottom Wrapper

Background Color
Modules Title
Text Color
Link Color
Background Image
Background Color
Modules Title
Text Color
Link Color
Background Image
 
Top of Page
BCMath lib not installed. RSA encryption unavailable